Murals & Commissions
A tile mural starts with a measured drawing of the wall and ends with a numbered set of fired panels and a layout map for the installer.
How it works
- Site visit or photos with measurements
- Sketch and colour proposal
- Test tiles in the chosen glazes
- Painting and firing in sections
- Numbered panels and a layout drawing
Timing
Most murals take eight to fourteen weeks. In July and August the studio slows down: the kiln room gets too hot to work in the afternoons.
Restoration jobs that match a handful of old tiles usually take three to five weeks.